#2 (permalink) Sat Oct 03, 2009 14:06 pm how to make a report? |
|
|
The high DP across (cooler A) indicates low performance and the gas outlet temperature setpoint cannot be reached. This happened once before. ( Chase back history.)
The problems with this cooler are not clear. It may be being caused by fouling, or it may be a mechanical problem, but it’s very difficult to clean the cooler successfully. Previous attempts to improve the efficincy of this cooler have proven ineffective when viewed against the performance of cooler B. which performs the identical function.
Please note that at the present time gaslift demand is high, so whenever cooler B cannot handle the gaslift pressure required, then cooler A must take over on that.
We need to make a plan to do some of these tasks at the next shutdown for more clarification, if we desire to see an improvement: + continue cleaning job: + carry out borescope inlet/outlet nozzle to find any obstruction or abnormality.
After that, if there is no improvement, and based on gas produced forecast, gaslift consumption, …. one option is to consider changing this cooler after a shorter period of low efficiency/heat transfer, and also a high restriction being indicated on the outlet compressor. The cost of changing is high, after having checked price from vendor (10.000£/each)
Please note that the price is only an approximate price for your reference.
Kitos. _________________ Keep it simple ... Keep it interesting. |
|
Kitosdad Language Coach

Joined: 04 Mar 2009 Posts: 13417 Location: ESSEN, Germany, (but English.)
|